Buying off-plan in Marrakech: the questions to ask before you reserve
Developer, contract, payment schedule, delivery: the questions to ask before reserving an off-plan apartment or villa in Marrakech.

Buying off-plan often lets you choose your floor, orientation and finishes, and pay as construction progresses. It is also a purchase based on a project: the property does not exist yet. Before reserving a new apartment or villa in Marrakech, these are the questions we always go through with our clients.

1. Who is the developer?
Look at the projects they have already delivered: are they finished, lived in, well maintained? Visit a completed residence if you can. A reliable developer is happy to show previous projects, permits and partners.
2. Is the project authorised?
Ask for the building permit and recent land-title documents. Under the VEFA framework, a reservation contract cannot be signed before the building permit is obtained. Have your notary check the documents for the exact project.
3. What does the contract say?
In Morocco, off-plan sales (VEFA) are regulated by law. The contract must describe the property precisely: its surface area, price, delivery date and payment schedule. Read the terms covering delays, changes to the project or withdrawal, and have the contract reviewed before you sign.
4. How are payments staged?
Off-plan, the price is paid in stages linked to construction progress. Ask for the exact schedule and what triggers each payment. Also check what the price includes: parking, storage, finishes, fitted kitchen, connection fees.
5. Are the plans and specifications clear?
- A dimensioned plan of your unit, with the living area and outdoor spaces.
- The specification of materials and fittings (floors, windows, air conditioning, kitchen).
- The orientation, the view and what may be built around it.
- The shared areas: pool, gardens, security, access.
6. When and how does handover work?
Ask for the planned date and how progress will be reported to you. At handover, an inspection lets you record any defects before the final deed is signed. Also allow for the time it takes to obtain the title deed.
7. And afterwards: live in, rent out or resell?
If you plan to rent, find out about the residence rules, how the shared areas are managed and the service charges. If you live abroad, ask who can look after the property: handover, furnishing, letting and maintenance.
Visit before you sign
Even off-plan, there is a lot to see. Go to the site to judge the surroundings: access, neighbours, shops, noise, the real view from your chosen floor. If there is a show apartment or villa, visit it to get a feel for the volumes and the quality of the finishes. If you cannot come, your advisor can do the visit by live video and answer your questions on site.
Costs on top of the price
The advertised price is not the total cost. Allow for registration duties, notary and land registry fees, any connection and management fees, and furnishing if you plan to rent out. Ask for a detailed estimate for your unit before reserving: it avoids unpleasant surprises when the deed is signed.
Buying from abroad
Many of our clients buy from Europe or the Gulf. Keep the records of your transfers from abroad: your bank and the notary will tell you what is useful later on, in particular if you resell. For the signatures, a power of attorney is possible if you cannot travel.
Warning signs
- Pressure to reserve very quickly, with no time to read the documents.
- Payments requested without a signed contract or unrelated to construction progress.
- Vague plans or specifications.
- A developer who cannot show any delivered project.
Our role
At Zena Luxury, we select new-build projects in Marrakech and follow their construction. We help you compare units, read the documents and prepare each step with the notary, right up to receiving the keys.
Build a complete comparison file for each unit
Keep a dated unit plan, the specification schedule, draft contract and payment schedule together. Check that the unit reference, floor, orientation and annexes match across the documents. Ask how the advertised area is calculated and how terraces, balconies, parking and storage are treated. Retain the document versions used to make your decision.
- What exactly does the advertised area cover, and which annexes are included?
- Which materials and equipment are specified, with what references or characteristics?
- Which changes can be requested, and how will their cost be confirmed in writing?
- Who provides construction updates, and how often?
- Which documents and receipts accompany each payment stage?
Prepare the handover inspection
Prepare a room-by-room checklist based on the agreed specifications. During the inspection, check openings, sockets, lighting, water drainage and the kitchen equipment provided. Photograph items requiring attention and ask for a written record with a named follow-up contact. Have the notary and project representatives confirm the formalities and documents to be delivered.
Official documents to consult
Checked on 20 November 2026. The VEFA text published by ANCFCC sets out contract forms, required particulars and the framework for off-plan sales. ANCFCC also describes the property certificate as a record of the legal and material situation of the property at the time of the request. Ask your notary for recent documents corresponding to the exact property.
A question about your project? An advisor replies within 24 hours.
Talk to an advisor

